Customization: | Available |
---|---|
Condition: | New |
Customized: | Non-Customized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Simulation standard open airway,
2. Artificial hand-position chest compression
(1)Dynamic light indicator:standard compression depth(5-6 cm zone)green light.below compression depth (less than 5 cm) yellow light. Above compression depth(more than 6 cm) red light.
(2) Digital counter display of correct and wrong compression.
(3) Sound prompting of wrong compression and reason
3. artificial respiration(blowing)
(1)Inhalation from 500/600 ml to 1000 ml Dynamic light respectively shows the quantity of inhalation volume;standard inhalation volume(500/600 ml-1000 ml)green light. Above or below inhalation volume,red or yellow light
(2)Digital counter display the times of correct and wrong operations
(3) Sound prompt
4. Ratio of compression and artificial respiratory: 30: 2 (one or two person)
5.Operating cycle: One cycle includes five times of 30: 2 ratio of compression and artificial respiratory.
6. Operation frequency: 100 times per minute (the latest international standard)
7. Operation methods: Exercise operation; Examine operation;self-defined operation
8. Operation time:Timing by the unit of second.
9. Sound prompting device: Volume control; Turning on or turning off sound prompting device
10. Detached Printer: Print operation result
11. Examination of pupil response: Mydriasis and myosis
Item | Quantity |
Advanced full-body CPR manikin | 1 unit |
Advanced LCD display | 1 |
Luxury portable plastic box | 1 |
CPR operation pad | 1 |
One box of face shield sheets | 50 pieces per box |
changeable lung sac | 4 |
changeable face skin | 1 |
Temperature sensing print paper | 2 |
Latest textbook | 1 |
Guide manual | 1 |
Packing Size: 90*37*53.5cm |
1. Compared with most cardiopulmonary resuscitation simulators on the market, this product has more complete functions, and is jointly developed and manufactured by factory researchers and domestic authoritative experts.
2. Each workshop of the factory adopts strict technical control, and the injection molding process of the product, as well as the function test, are all operated by professionals. Before leaving the factory, all functions of the product need to be tested before packaging and transportation